Construction Day 16

Late afternoon and into the evening


Paul came round in the afternoon and we spent about 4 hours welding the chassises together.

The picture shows the second chassis without the cross pieces which because we could not obtain 50x25mm box section has had to be fabricated.

The first chassis is stacked on the second chassis.

Early evening I decided to tap the ends of the first 4 wheel shafts and to paint them black, then I looked round for something else to paint so do the centre sections.

Then I thought let's paint the wheels being careful not to get the paint in the location of the bearing and not on the tread - only the outer face side was painted.

It is hoped to complete a basic truck in time to put it on the track on Sunday - New Year's eve and to be able to fully workout the design of the leg supports.