The Diary of the Re-building Baudot 8187
|
|
|
|
|
|
Day 18-- A day pottering in the workshop
|
|
|
The water gauges were re-fitted with
a better pack of PTFE.
The spark arrestor was fitted. This is a circular tube of 1/8" stainless steel mesh with a gap for the blower pipe. The aim is to reduces the likelihood of hot embers coming out of the chimney and burning clothes!!!
|
The injector has been re-fitted after an over night soak in vinegar. | |
The speed controller has been modified for 24V operation. | |
Baudot NOW is ready for its steam trial on Wednesday 28th February 2007 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|