The Diary of the Re-building Baudot 8187
|
|
|
|
|
|
Day 13 -- A half day in the workshop
|
|
|
The bolts to the smoke box saddle have been cut off. |
|
The Chimney has been bolted down and bolts cut off. |
|
The clack valve for the water pumps was cleared out and re-fitted and connected up. |
|
The clack valve for the Injector was cleared out and re-fitted and connected up. |
|
The blow down valve was fitted. |
|
The manifold and pressure gauge fitted. |
|
The Blower pipe fitted. |
|
The top of the blast nozzle was fitted and the blower pipe re-aligned. |
|
The smoke box door was closed by the fitting. |
The replaced steam oil lid | |
The fitted the water tank tops and latching devices | |
Also completed today:-
|
|
|
|