The Diary of the Building of a Guard's Van
|
|
|
|
|
Guard's Van build or final coach / closed in wagon
|
|
| the roofs are now painted their first coat of paint |
|
| The rear of the van with the first coat of chevrons |
|
| The side of the van |
|
| The circuit diagram for a flashing light circuit for the rear of the van for night time driving which happens several times a year ... | ![]() |
The completed circuit and tested ok. Now additional LEDs will be added for that there is a set of 3 each side that flash alternatively at about 1 second intervals. |
|
| Here the van has two hi bright LED
fitted which flash alternatively so you will only ever see one on at a
time.
More may be added to make the truck more visible at night!!! |
|
| Here Paul is running Baudot with the van in tow !!! |
|
The rear section with the lights has been separated from the main section and then bolted back together so that the van can run as a short item and one passenger or large item without a passenger. |
|
| This is the rear of the main part and will be fitted with a red light in case it is needed as a rear part of another train. |
|
|
|
|
|